House update: drywall hung, taping and mudding under way, siding progresses

Standard

All the drywall is now hung and taped, with the first round of “mudding” complete. It makes the interior look more like a house and less like a barn.

Outside, the siding continues to go on, having reached the front of the house.

After the drywall is done, next comes the installation of the in-floor heat and then pouring the concrete floors.

Looking down into the living room from the loft

Looking down into the living room from the loft

Looking from the living room toward the dining room

Looking from the living room toward the dining room

Robin's sewing room with the loft above

Robin’s sewing room with the loft above

The kitchen, from the living room

The kitchen, from the living room

Master bedroom

Master bedroom

First-floor hallway

First-floor hallway

Garage

Garage

Shingles on the front of the house

Shingles on the front of the house

East side of the house

East side of the house

Looking down the elevator shaft, with empty drywall-tape boxes at the bottom

Looking down the elevator shaft, with empty drywall-tape boxes at the bottom

Advertisement

2 thoughts on “House update: drywall hung, taping and mudding under way, siding progresses

  1. Katie Braam

    Looks great Dad! The view is amazing.

    On Sat, Feb 25, 2017 at 9:05 PM, See Más America wrote:

    > Phil Semas posted: “All the drywall is now hung and taped, with the first > round of “mudding” complete. It makes the interior look more like a house > and less like a barn. Outside, the siding continues to go on, having > reached the front of the house. After the drywall is” >

Discuss

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s