The insulation has been installed in the house, and drywall hanging began today. Meanwhile, the siding continues to go on. In addition, we now have electricity in the building.

Drywall hanging has begun. This is the study.

Insulation is in. Batting in the ceiling and interior walls, blow-in insulation (the pink stuff) in the exterior walls.

Siding complete on one section of the back of the house. If you look closely at the top, you can see fish-scale shingles.

Siding now going on the end and the front of the garage.

The power is on, to some outlets.