Quite a bit happened on the house while we were gone for two months. All the wiring — electrical and low voltage — has been completed and passed inspection. The window and other exterior trim is mostly in place, and the siding is going on. The insulation is supposed to start going in later this week.

Siding going on the back of the garage. That’s not the final color.

Exterior trim has been added around the windows.

Wires everywhere: electrical, low-voltage, and heating

A pile of siding